The MAN TGM 18 P480 platform offers maximum safety at maximum height. The work platform provides access to hard-to-reach places up to a height of 48 meters. More...
The P480 aerial work platform on the MAN TGM 18 car chassis is suitable for assembly, construction, reconstruction and other high-altitude work that requires mobility and frequent relocation of the platform. The construction of the car and the minimal dimensions of the chassis predetermine it for use in the city and light terrain.
The platform consists of a turntable on the chassis, a boom with an articulated telescope and a work basket on the so-called JIB arm, which allows you to get the work basket even in hard-to-reach places. The maximum reach of the platform is 48 meters in height and 28 meters to the side.
The truck platform meets strict safety regulations and international standards. The stability of the platform is ensured by the subframe of the vehicle with four retractable supports that absorb the load of the platform.
The MAN TGM 18 P480 platform has been developed to have minimal operating and maintenance costs.
Manufacturer | Palfinger |
---|---|
Space required on bridge | light terrain |
Horizontal outreach | 28 m |
Max. lowering depth | 14 m |
Space required on bridge | 4,6 m |
Max. load on platform | 600 kg |
Total weight | 17980 kg |
Lenght | 9,92 m |
Transit width | 2,51 m |
Transit height | 3,96 m |
Maximum working inclination | |
Maximum wind speed | 12,5 m/s |
Working height | 48 m |
Platform dimensions (extension) | 2,47 m (3,88 m) x 1,05 m |
Propulsion | auto-motor |
Leveling supports | 4x |
Dimensions at installation | 9,92 m x 6,7 m |
Operating temperature | 0°C+ |
The machines meet all strict safety requirements and our employees are regularly trained.
Within 15 minutes we will get you to the place under the bridge structure. Our PODMOSTOVKY can move on a bridge structure with an inspection bridge in the working position.
From the footbridge of our machines you can get to the entire surface of the bottom of the bridge deck, including the sloping sides - the machines have sufficient lateral reach and additional scaffolding for safe access to the side of the bridge deck.